LR, LRK, LR-NT, LRK-NT 21 - 32
We reserve the right to make changes to dimensions and construction 2 edition 30.10.2007
© Copyright YGNIS AG CH-Ruswil
1. Precautions
STEPS TO BE TAKEN IN CASE OF DANGER
Close fuel supply, disconnect unit from mains using emergency stop or main switch (outside of the boiler room).
Use suitable fire extinguishers to extinguish flames.
Occurrence of gas smell (gas units)
- Ventilate the affected rooms thoroughly by opening doors and windows.
- Do not use any electronic devices (mobile phone, etc.).
- Do not activate any electrical contacts (light, motor, lift, door bell, etc.).
- Do not ignite matches or lighters, and do not smoke.
- Call the gas board or heating engineer.
PACKAGING
After removing all packaging materials, check the contents to
make sure that no damage has occurred during shipping.
When in doubt, do not use the apparatus and contact the
supplier.
The packaging materials are to be disposed of properly.
THE BOILER UNIT
Smooth boiler performance and manufacturer’s guarantee are
dependent upon adherence to the boiler installation, operation
and maintenance instructions contained in this booklet.
Never permit children or unauthorized persons to tamper with
the equipment.
The unit must be used only for its expressed application. All
other uses are considered dangerous.
The burner's minimum and maximum delivery settings, all
pressures and temperatures must all be contained in the range
stipulated in this manual.
Modification of the equipment in order to alter its performance
or applications prohibited.
Do not open or tamper with components of the unit other than
those parts of the unit that are subject to maintenance
operations.
Never touch the hot parts of the unit; these parts (flue gas
conduit, sight glass, burner parts, etc) may remain hot for quite
some time after the burner has switched off.
Never touch the unit with wet parts of the body or without
wearing shoes.
When the unit is not to be used for a longer period, the main
power switch on the electrical control panel must be switched
off and the manual valve on the unit fuel supply line must be
closed.
The device contains components made of synthetic silicon
mineral fibres (ceramic and glass fibres, insulation wool).
These components must be disposed of appropriately at the
end of their life cycle. Local regulations must be observed.
INSTALLATION AND SETTINGS
The installation and calibration of the unit must be performed
exclusively by qualified personnel in conformity with existing
regulations and the indications provided in this Manual.
THE BOILER ROOM
The boiler room must be lockable and it's external air openings
must conform to the norms prevailing locally. When in doubt
regarding air circulation, measure the CO
2 count with the
burner operating at its maximum delivery and the room
ventilated only by the burner ventilation air openings and a
second time with the door open. The CO
2 count measured in
both cases must not differ. Should there be more than one unit
in the same room, this test must be performed with all the
equipment operating simultaneously.
Never obstruct the boiler room's air openings, the burner fan
suction opening, and any air ducts and ventilation.
The equipment must always be protected against rain, snow,
and freezing conditions.
The boiler room must be kept clean and free of volatile
substances that may be sucked into the fan and clog the inner
burner or combustion head air ducts.
The combustion air must be free of halogens (chlorine and
fluorine compounds). If there is any doubt, the quality of the
combustion air must be ensured with an external air intake.
ELECTRICAL INSTALLATION
Electrical connections must be made exclusively by qualified
personnel and all prevailing electrical regulations must be
scrupulously observed.
Make sure that the electrical power supply used for connection
conforms to the specifications indicated on the rating plate and
in this manual.
The unit must be correctly connected to an efficient ground
system in conformity to the prevailing norms and checked and
controlled for efficiency by qualified personnel when in doubt.
Never confuse neutral wires with phase wires.
The unit must be hooked up to the electrical network with a
plug-socket connection that is such as to prevent inversion of
phase and neutral. Install a master switch for the heating plant
as requested by existing legislation.
The entire electrical system, and all cable sections in
particular, must be adequate to deliver the maximum absorbed
power value indicated on the equipment's rating plate and in
this manual.
If the mains power cable is found to be defective, it must be
replaced only by qualified personnel.
Never stretch power supply cables and keep them well away
from sources of heat.
FUEL
The unit must be fed with the type of fuel for which it has been
preset as indicated on the rating plate.
The fuel pressure must be according to the values listed in the
burner manual.
The fuel line that feeds the unit must be sized according to the
requirements of local regulations and the prescriptions in the
burner manual. The line must be perfectly sealed. The fuel
supply line must also be equipped with all the control and
safety mechanisms required by local regulations in force. The
line must be free from all impurities; take particular care that
foreign matter does not enter the line during installation.
Oil:
- The light oil storage tank must be adequately protected
against penetration of impurities and water. The fuel tank
must be kept full of fuel during the summer in order to
avoid the condensation of humidity. Clean the tank
carefully before filling. Beware not to overfill the tank.
- Both the tank and the unit fuel supply line must be
protected from frost.
- Oil consumption and tank unit must be checked regularly,
in order for leaks to be detected in good time.
Gas:
- The gas line must be checked for leakage during
commissioning and after each disconnection.
MALFUNCTION
If the unit stops working and goes into lock-out and does not
resume operation after two or three manual lock-out reset
attempts, disconnect the power supply, do not attempt to
repair, and contact a qualified specialist.
All repairs required must be performed exclusively at a
technical servicing and/or technician centre authorized by the
manufacturer using original spare parts only. Failure to
observe the above may compromise the reliability and safety of
the equipment.
Any failure or damage resulting from improper use or
intentional damage will relieve the manufacturer from any
guarantee obligation.
MAINTENANCE
Maintenance must be performed by qualified personnel
regularly or at least once a year.
Prior to performing any maintenance operations, switch off the
power supply by using the main switch and cut off the fuel
supply as well.
Only parts indicated by the manufacturer in the Spare Parts
Catalogue may be replaced.
In order to avoid all types of health hazards, suitable clothing
and a protective mask must be worn for work on or with
components made of synthetic silicon mineral fibres (ceramic
and glass fibres, insulation wool).
4

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Ygnis Pyronox LRK bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Ygnis Pyronox LRK in de taal/talen: Engels als bijlage per email.

De handleiding is 1,29 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Andere handleiding(en) van Ygnis Pyronox LRK

Ygnis Pyronox LRK Installatiehandleiding - Nederlands - 40 pagina's

Ygnis Pyronox LRK Gebruiksaanwijzing en installatiehandleiding - Nederlands - 46 pagina's

Ygnis Pyronox LRK Installatiehandleiding - Deutsch, English, Français, Italiano, Espanõl - 40 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info